[ Post a Reply | Next | Previous | Up ]
 

Re: Coal

From: Jim
Location: Toledo
email:
Remote Name: 64.12.117.80
Date: 05.07.08
Time: 09:49:17 AM

Comments

The south half of the entrance channel was dredged in 2006, the inner harbor and the edison dock itself were dredged in 2007. The north side of the entrance is scheduled for this year.

compasshr.gif (2701 bytes)

Return to the Great Lakes & Seaway Shipping home page
Copyright © Boatnerd.com  All Rights Reserved.
This material may not be published, broadcast, rewritten or redistributed.
Terms of use
             Instructions/FAQ