by Denny » December 28, 2015, 10:31 am
Can someone please tell me when the CSL Tadoussac was removed from the Keefer Terminal over to Pool #1 Elevator? This would also make sense to move her there with a few CSL vessels laying up for the winter in Thunder Bay. I have heard and know that at least two of them are headed for lay-up in Thunder Bay the Pineglen and the Whitefish Bay and would assume one or perhaps both of them, will be at the Keefer Terminal this winter.
Can someone please tell me when the CSL Tadoussac was removed from the Keefer Terminal over to Pool #1 Elevator? This would also make sense to move her there with a few CSL vessels laying up for the winter in Thunder Bay. I have heard and know that at least two of them are headed for lay-up in Thunder Bay the Pineglen and the Whitefish Bay and would assume one or perhaps both of them, will be at the Keefer Terminal this winter.