by Grizzly » May 30, 2014, 7:35 pm
I didn't see what happened but they plan for the bridge in plenty of time for the boat to abort if needed it happened the 2012 season with the American Integrity. The bridge lost power half way up and thus the boat had room to abort the passage. Power came back, bridge went up all the way and the Am Int. Swung around and finished.
Also was there in 2011 when the Callaway was coming in. A sailboat lost power and was disabled in the canal. The Cally put on the brakes and swung a 360 while the USCG came in with their small boat and towed the sailboat out.
These things are well planned and thought out. The bridge has had power issues in the past.
I didn't see what happened but they plan for the bridge in plenty of time for the boat to abort if needed it happened the 2012 season with the American Integrity. The bridge lost power half way up and thus the boat had room to abort the passage. Power came back, bridge went up all the way and the Am Int. Swung around and finished.
Also was there in 2011 when the Callaway was coming in. A sailboat lost power and was disabled in the canal. The Cally put on the brakes and swung a 360 while the USCG came in with their small boat and towed the sailboat out.
These things are well planned and thought out. The bridge has had power issues in the past.