by AlexMich » June 1, 2010, 3:16 pm
With the tug and barges aside, the last freighter built was on the Canadian side in the mid 80s. This is the longest time in the history of Great Lakes shipping that there has not been any freighters built. I imagine the cost of building a new one is staggering and a very long contract commitment is needed to justify such a move. We'll most likely see more modernizations and changes to get extended life out of the existing boats. It'll be interesting to see how things go.
With the tug and barges aside, the last freighter built was on the Canadian side in the mid 80s. This is the longest time in the history of Great Lakes shipping that there has not been any freighters built. I imagine the cost of building a new one is staggering and a very long contract commitment is needed to justify such a move. We'll most likely see more modernizations and changes to get extended life out of the existing boats. It'll be interesting to see how things go.