Hamilton, Heddle's

Post a reply


BBCode is ON
[img] is ON
[url] is ON
Smilies are OFF

Topic review
   

If you wish to attach one or more files enter the details below.

Maximum filesize per attachment: 3 MiB.

Expand view Topic review: Hamilton, Heddle's

Re: Hamilton, Heddle's

by cpfan » September 9, 2015, 9:53 am

The CCG Daily Ops Report shows both in Hamilton for dry docking. It also says Long Term Refit. Hopefully that just means the summer, and fall.

Steve

Re: Hamilton, Heddle's

by TWilush » September 9, 2015, 5:51 am

Black is now being sandblasted in preparation for painting, Griffon has not yet been in the drydock, assuming she is going in.

Re: Hamilton, Heddle's

by Joanne » September 9, 2015, 12:53 am

The CCGS Griffon is there for her 5 yr. and although I believed the CCGS Martha L. Black was due for her 5 yr. she HAS been there a very long time. I'm on the St. Lawrence Seaway at CCG Base Prescott. I've been watching for Black to let go and head down for Quebec the last couple of months so my answer for her is, "I'm not sure anymore". The CCGS Griffon I would expect will be released VERY soon and head "Home"....

Joanne - The Prescott Anchor - Find us on Facebook.

Hamilton, Heddle's

by Dave2 » September 8, 2015, 2:29 pm

Any idea why the CCGS Griffon and CCGS Martha L Black have been in Heddle's so long???

Top