by guest6 » January 2, 2012, 4:56 pm
I'd speculate that Purvis wasn't interested in the AKA except possibly for scrap purposes. Lately they have been purchasing and using much larger purpose-built ocean-going deck barges, with almost twice the capacity of a converted carferry. (PML 9000-9000 tons, Ironmaster-10,000 tons, Chief Wawatam-5000 tons, Pere Marquette 41-5500 tons.) And the world market is awash with 20-35 year old ocean-going deck barges (granted many are too wide to enter the Lakes). Plus I believe that the tariff that Canada repealed on foreign purchase applies to used as well as new vessels, so that makes newer purpose-built deck barges even more cost effective.
Then again the AKA is practically at their back steps, so they may have looked it over.
I'd speculate that Purvis wasn't interested in the AKA except possibly for scrap purposes. Lately they have been purchasing and using much larger purpose-built ocean-going deck barges, with almost twice the capacity of a converted carferry. ([i]PML 9000[/i]-9000 tons, [i]Ironmaster[/i]-10,000 tons, [i]Chief Wawatam[/i]-5000 tons, [i]Pere Marquette 41[/i]-5500 tons.) And the world market is awash with 20-35 year old ocean-going deck barges (granted many are too wide to enter the Lakes). Plus I believe that the tariff that Canada repealed on foreign purchase applies to used as well as new vessels, so that makes newer purpose-built deck barges even more cost effective.
Then again the AKA is practically at their back steps, so they may have looked it over.