I recall that around 1992-1993 there was an upgrade to the facilities at the SMET dock to increase the amount of coal that could be reclaimed at the dock, and increase capacity to 20-25 million tons a year above what was originally built in 1976, though the facility had been planned for eventual enlargement.
Wasn't this around the same time when there was some potential of getting this coal into the Canadian power generation trade? I seem to recall a few ULS self-unloaders being loaded there for delivery to Ontario Hydro during the early 1990s.
The coal-fired power plant in Belledune, New Brunswick had opened up around that time, which used coal from SMET. Overseas demand for coal from SMET increased so some of the Canadian self-unloaders would load for Sept Isles, or the Strait of Canso for topping-off deep-sea colliers.
Up until 1992, Ontario Hydro had a 33% mix of nuclear, hydro and coal. When all four units of the Darlington Nuclear Power Station - east of Toronto - came online around 1994, the mix became 50% nuclear, 25% hydro and 25% coal.
A few years later it was revealed that Ontario Hydro had technical issues with their nuclear power plants, which required modifications. The coal-fired power plants were utilized more fully at that time until they were phased out.
[quote=Guest post_id=275773 time=1788380012]
[quote=Guest post_id=275770 time=1788317041]
I recall that around 1992-1993 there was an upgrade to the facilities at the SMET dock to increase the amount of coal that could be reclaimed at the dock, and increase capacity to 20-25 million tons a year above what was originally built in 1976, though the facility had been planned for eventual enlargement.
[/quote]
Wasn't this around the same time when there was some potential of getting this coal into the Canadian power generation trade? I seem to recall a few ULS self-unloaders being loaded there for delivery to Ontario Hydro during the early 1990s.
[/quote]
The coal-fired power plant in Belledune, New Brunswick had opened up around that time, which used coal from SMET. Overseas demand for coal from SMET increased so some of the Canadian self-unloaders would load for Sept Isles, or the Strait of Canso for topping-off deep-sea colliers.
Up until 1992, Ontario Hydro had a 33% mix of nuclear, hydro and coal. When all four units of the Darlington Nuclear Power Station - east of Toronto - came online around 1994, the mix became 50% nuclear, 25% hydro and 25% coal.
A few years later it was revealed that Ontario Hydro had technical issues with their nuclear power plants, which required modifications. The coal-fired power plants were utilized more fully at that time until they were phased out.