by cpfan » October 21, 2010, 8:06 pm
From the Europeanoilandgas website.
"the M/V Palmerton was completed in November 2009, the M/V Palabora in January 2010, the M/V Palembang in May 2010 while the M/V Palau will be delivered in July 2010. These are GL +100 A5 E3 class, multipurpose dry cargo ships, equipped for the carriage of containers and dangerous goods. Strengthened for heavy cargo, the cargo hold features boxed, steel flooring, tween deck hoistable in three different heights. The total cubic capacity of the hold is 15,700 cubic metres."
The Palmerton has just finished a visit to the Lakes, unloading in Burns Harbor on Oct 11-12.
Steve
From the Europeanoilandgas website.
"the M/V Palmerton was completed in November 2009, the M/V Palabora in January 2010, the M/V Palembang in May 2010 while the M/V Palau will be delivered in July 2010. These are GL +100 A5 E3 class, multipurpose dry cargo ships, equipped for the carriage of containers and dangerous goods. Strengthened for heavy cargo, the cargo hold features boxed, steel flooring, tween deck hoistable in three different heights. The total cubic capacity of the hold is 15,700 cubic metres."
The Palmerton has just finished a visit to the Lakes, unloading in Burns Harbor on Oct 11-12.
Steve