by wlbblw » November 5, 2010, 4:04 pm
That's not Abbott Rd, it's the South Park Ave. Lift Bridge. Icebreaking is the only reason they have opened it in the last few years. The last time a large vessel transit went up there, it was for dredging a few years ago, and the last time it was up for a cargo was back around '99-'00 when the Mobil Oil tanker dock was active for a time getting gasoline by boat out of Nanticoke.
The railroad bridges heading upstream from the lake are first: "The Bridge at CP-1" or just "The CP-1 Drawbridge", but also called "CSX Main Line River Bridge" sometimes, depending on who's talking. It was originally the New York Central's "River Bridge" or "RB" for short. Next is the Norfolk Southern's bridge that is in the raised position & locked out. It was originally the Nickle Plate Road's bridge. Next is the CSX "CP-Draw" bridge. This was originally the Buffalo Creek Railroad's "River Bridge". Next are the old pilings and approach span for the DL&W RR's "Buffalo River Draw". The lift span has been removed. Next are the pilings for the DL&W's upper river drawbridge, but I don't know if it ever had a name, because this is the end of the navigable channel and no ships ever transited here. In the years 1914 to 1917 the looping bends in this area were straightened so as to construct a navigable channel for shipping traffic. Municipal waste, slag, and cinders were used to fill in the old creek bed and a new section was then cut to make the shape seen today. Dredging took place as far as the DL&W upper river drawbridge but the navigable channel ended there. Bank straightening improvements were also made further upstream towards Bailey Ave. at that time, but no industry ever located there and that section was never dredged.
As far as the tugs go, the tug-barges don't need a G-tug since the City Navigation Rules state that since a tug-barge unit already has a tug, they are exempt from the rules regarding freighters. The tug-barge may call a G-tug anyway, if the current or the weather was bad enough, or if maybe a bow thruster was out or something like that.
By city law, all ships must have a tug when moving forward through their bridges, and two tugs when moving stern first. As the previous poster said, the English River has been leaving with out a tug from time to time, and that would seem to be in violation of the rules, and I don't know why they are allowed to do this.
All G-tug tows must be called in ahead of time because some of the crew have to drive here from out of town. Again, as the other poster said, they make up and break off the tow in the North Entrance so as to have lots of room to move around.
-B in B
That's not Abbott Rd, it's the South Park Ave. Lift Bridge. Icebreaking is the only reason they have opened it in the last few years. The last time a large vessel transit went up there, it was for dredging a few years ago, and the last time it was up for a cargo was back around '99-'00 when the Mobil Oil tanker dock was active for a time getting gasoline by boat out of Nanticoke.
The railroad bridges heading upstream from the lake are first: "The Bridge at CP-1" or just "The CP-1 Drawbridge", but also called "CSX Main Line River Bridge" sometimes, depending on who's talking. It was originally the New York Central's "River Bridge" or "RB" for short. Next is the Norfolk Southern's bridge that is in the raised position & locked out. It was originally the Nickle Plate Road's bridge. Next is the CSX "CP-Draw" bridge. This was originally the Buffalo Creek Railroad's "River Bridge". Next are the old pilings and approach span for the DL&W RR's "Buffalo River Draw". The lift span has been removed. Next are the pilings for the DL&W's upper river drawbridge, but I don't know if it ever had a name, because this is the end of the navigable channel and no ships ever transited here. In the years 1914 to 1917 the looping bends in this area were straightened so as to construct a navigable channel for shipping traffic. Municipal waste, slag, and cinders were used to fill in the old creek bed and a new section was then cut to make the shape seen today. Dredging took place as far as the DL&W upper river drawbridge but the navigable channel ended there. Bank straightening improvements were also made further upstream towards Bailey Ave. at that time, but no industry ever located there and that section was never dredged.
As far as the tugs go, the tug-barges don't need a G-tug since the City Navigation Rules state that since a tug-barge unit already has a tug, they are exempt from the rules regarding freighters. The tug-barge may call a G-tug anyway, if the current or the weather was bad enough, or if maybe a bow thruster was out or something like that.
By city law, all ships must have a tug when moving forward through their bridges, and two tugs when moving stern first. As the previous poster said, the English River has been leaving with out a tug from time to time, and that would seem to be in violation of the rules, and I don't know why they are allowed to do this.
All G-tug tows must be called in ahead of time because some of the crew have to drive here from out of town. Again, as the other poster said, they make up and break off the tow in the North Entrance so as to have lots of room to move around.
-B in B