BNSF Dock

Post a reply


BBCode is ON
[img] is ON
[url] is ON
Smilies are OFF

Topic review
   

If you wish to attach one or more files enter the details below.

Maximum filesize per attachment: 3 MiB.

Expand view Topic review: BNSF Dock

Re: BNSF Dock

by Guest 1 » January 2, 2014, 10:52 pm

Max capacity of the conv. Feeding the dock is around 6000tph car dump itself is around 4000. Reclaiming rates very based on operator experience / skill and condition of the pile there digging in. If they are able to use 2 reclaimers at once that also helps with feed rates.

Re: BNSF Dock

by DCN » January 2, 2014, 9:48 pm

The only reference I found with numbers states that BNSF can dump an 18,000 ton train in 5 hours and send it directly to the dock, meaning they can at least do 3,600 tons an hour recharge. I also came across statements saying that they can be dumping trains and reclaiming from the stockpiles to recharge the dock at the same time so I would assume recharge capacity is actually higher than the 3,600 tons/hour.

DCN

Re: BNSF Dock

by Grizzly » January 1, 2014, 5:23 pm

The BNSF dock is broken so often it would really be difficult to figure an average recharge time.

Re: BNSF Dock

by Guest » December 31, 2013, 10:20 pm

I can't answer how long it takes BNSF to recharge but the ship loader was installed at west of 6 in 1983

BNSF Dock

by Scott » December 31, 2013, 5:43 pm

How long does it take BNSF to "Reclaim" taconite pellets to continue loading a vessel? Also, I'm used to the "old" DM&IR ore docks, what year was the ship loader installed into the current CN dock in west Duluth?

Top