by Grizzly » March 3, 2014, 3:49 pm
Old I beamer wrote:Gee, things must of changed over the years. The USCG required us to have it to remove hatches when the automatic hatches didn't work. We sometime used it to remove thee ballast pumps.
See that is what I heard from the Cort's deck crew. That it was for opening the hatches in case of failure, as well as other uses. Also learned that it was operated and maintained by the engineering side and not deck crew.
Just what I heard when I was on.
[quote="Old I beamer"]Gee, things must of changed over the years. The USCG required us to have it to remove hatches when the automatic hatches didn't work. We sometime used it to remove thee ballast pumps.[/quote]
See that is what I heard from the Cort's deck crew. That it was for opening the hatches in case of failure, as well as other uses. Also learned that it was operated and maintained by the engineering side and not deck crew.
Just what I heard when I was on.