by Denny » December 20, 2011, 3:20 pm
According to what I just saw on the Port of Montreal's website, the Gordon C. Leitch is due to arrive on 12/21 to unload cargo that was loaded at both Toledo and Goderich and is next due into Port Cartier to load iron ore I presume. I would think that if the Leitch loads in Port Cartier, then she will either lay-up in Montreal with a storage cargo of ore for Hamilton, or continue straight to Hamilton unload her ore cargo there and then lay-up in Hamilton.
According to what I just saw on the Port of Montreal's website, the Gordon C. Leitch is due to arrive on 12/21 to unload cargo that was loaded at both Toledo and Goderich and is next due into Port Cartier to load iron ore I presume. I would think that if the Leitch loads in Port Cartier, then she will either lay-up in Montreal with a storage cargo of ore for Hamilton, or continue straight to Hamilton unload her ore cargo there and then lay-up in Hamilton.