by Jon Paul » September 10, 2021, 11:29 am
Its not uncommon for the Sykes to take on a partial load of limestone at Port Dolomite and Port Inland but in thus current trip they also loaded at Drummond Island. Have they done this before and are the loads from all 3 ports put in separate compartments or mixed throughout. TIA
Its not uncommon for the Sykes to take on a partial load of limestone at Port Dolomite and Port Inland but in thus current trip they also loaded at Drummond Island. Have they done this before and are the loads from all 3 ports put in separate compartments or mixed throughout. TIA