by Denny » March 13, 2025, 3:41 pm
For anyone interested in her delivery and maiden voyage from Croatia, they left the Garrucha, Spain Anchorage on March 13 after arriving at anchor then on March 12. They arrived in port at Garrucha, Spain on March 11 if I’m correct,departed that I think on March 12 and went to anchor the same day then off of Garrucha, Spain. Sorry if I don’t have any of this information correct then on them. They are now due at Ceuta, Spain on March 14 per their AIS. I don’t know if they fueled or loaded stability cargo in Garrucha, Spain before their voyage across the Atlantic Ocean? Their next stop is in Ceuta, Spain so I don’t know if this will be to fuel or to load cargo for stability before they cross the Atlantic for Canada? How long it will take them to make the trip then from Croatia to Canada? I don’t think this is quite as long of a trip if it was had they been built in China like some of the other Equinox Class ships. I figure they will probably arrive in Canada sometime the latter half of April maybe and begin trading here in the Great Lakes in late April or sometime in May then? With the Algoma Endeavour now on its way here to Canada and this was talked about last year, what does this hold then as far as the future goes for the John D. Leitch? Will she sail at all in 2025 or is she finished with the new Algoma Endeavour arriving soon? I thought that I had read last year that once they arrive, the Algoma Endeavour eventually will be the replacement for the John D. Leitch! I suppose this is still true but just curious if Algoma still plans on using and sailing the John D. Leitch in 2025? Thanks for any type of information you may have.
For anyone interested in her delivery and maiden voyage from Croatia, they left the Garrucha, Spain Anchorage on March 13 after arriving at anchor then on March 12. They arrived in port at Garrucha, Spain on March 11 if I’m correct,departed that I think on March 12 and went to anchor the same day then off of Garrucha, Spain. Sorry if I don’t have any of this information correct then on them. They are now due at Ceuta, Spain on March 14 per their AIS. I don’t know if they fueled or loaded stability cargo in Garrucha, Spain before their voyage across the Atlantic Ocean? Their next stop is in Ceuta, Spain so I don’t know if this will be to fuel or to load cargo for stability before they cross the Atlantic for Canada? How long it will take them to make the trip then from Croatia to Canada? I don’t think this is quite as long of a trip if it was had they been built in China like some of the other Equinox Class ships. I figure they will probably arrive in Canada sometime the latter half of April maybe and begin trading here in the Great Lakes in late April or sometime in May then? With the Algoma Endeavour now on its way here to Canada and this was talked about last year, what does this hold then as far as the future goes for the John D. Leitch? Will she sail at all in 2025 or is she finished with the new Algoma Endeavour arriving soon? I thought that I had read last year that once they arrive, the Algoma Endeavour eventually will be the replacement for the John D. Leitch! I suppose this is still true but just curious if Algoma still plans on using and sailing the John D. Leitch in 2025? Thanks for any type of information you may have.