Cuyahoga and Michipicoten status
-
guest
Re: Cuyahoga and Michipicoten status
If the nichipicoten does go to Erie to the shipyard she will have to be towed i cant see her being sailed on her own power. If she fails inspection port colborne is just across the lake.
-
Guest
Re: Cuyahoga and Michipicoten status
Interesting = spending that much money for another drydocking. They seem to have met their customers needs this season with her and the Cuyahoga out of service for most of the year.
So this will be adding to their carrying capacity just when one more customer is gone - Algoma Steel fires up their EAF in the spring. (Unless they'll haul DRI if that new plant is going to use that feedstock).
So either they are going to try to grab business from some other Canadian company or they will layup some other boat. IMO.
So this will be adding to their carrying capacity just when one more customer is gone - Algoma Steel fires up their EAF in the spring. (Unless they'll haul DRI if that new plant is going to use that feedstock).
So either they are going to try to grab business from some other Canadian company or they will layup some other boat. IMO.
-
Geest
Re: Cuyahoga and Michipicoten status
I have heard that the Cuyahoga is done for, too much damage from the fire to warrant repairs to such an old vessel. Next stop for her will be the scrapyard.
Michipicoten Im sure will sail again, as said before in these forums she is due for inspections this year anyway and I believe the owners have taken the time to get everything sorted out aboard before they allow inspectors back aboard. She'll be back out next season.
Michipicoten Im sure will sail again, as said before in these forums she is due for inspections this year anyway and I believe the owners have taken the time to get everything sorted out aboard before they allow inspectors back aboard. She'll be back out next season.
-
Matt
Re: Cuyahoga and Michipicoten status
Erie is closer to Port Colborne; which will be her final destination.
-
Guest
Re: Cuyahoga and Michipicoten status
It is confusing - does Erie charge the much less than Fraser than to have her sit idle for a couple of months and then deadhead to Erie?
Were the dry-docks in both Eire and Fraser occupied for the last two months otherwise why wouldn't you have taken advantage of the warmer weather and higher productivity that allows?
Were the dry-docks in both Eire and Fraser occupied for the last two months otherwise why wouldn't you have taken advantage of the warmer weather and higher productivity that allows?
Duluth Guest wrote: November 20, 2024, 10:27 amShe was temporarily repaired at Thunder Bay and made the trip to Duluth under her own power with a tug escort all the way. She was drydocked in Superior, at Fraser Shipyards, where permanent repairs were made to the crack and associated framing. A slew of other non-compliance issues were also addressed at that time but she was operating on an extension to her 5 year (as well as a few other required surveys) when the stress crack opened up. There are other surveys coming due in Spring of 2025. As I understand it, even with the drydocking in Superior, Transport Canada wouldn't allow a continuance of the 1 year extension without a full drydocking survey (as well as the other overdue surveys) and satisfactory completion of the findings from them. She will likely be heading to Erie for those outstanding surveys and any work that arrises from the findings. Her fate will likely be decided after those surveys are completed and a price tag attached to the work. My $0.02.algowest wrote: November 20, 2024, 8:57 am If my memory is right on this one, Michipicoten had temporary repair done so she could make trip to Fraser/Duluth for inspection.
So permanent repairs have not been done.
Assume Fraser has winter layup work already booked, so that would be reason for Michipicoten to head to Erie for drydock and potential permanent repairs.
-
Custom500
Re: Cuyahoga and Michipicoten status
Is it possible she's waiting for the bill to be paid?
-
guest
Re: Cuyahoga and Michipicoten status
If they are going to tow her to Erie what are they waiting for Christmas?
-
Guest
Re: Cuyahoga and Michipicoten status
OK!! Well this thread is interesting 😂.we shall wait and see if she stays or she goes.. I vote she stays🤷.
-
Guest
Re: Cuyahoga and Michipicoten status
Frasier Shipyard confirmed publicly weeks ago that the necessary repairs were done.Guest wrote: November 20, 2024, 1:02 pm she will sit where she is until perment repairs are done. no agency is going to sign off on the temporary light plating done only so that she woul float in order to remove her from dry dock. I don't think that they would even allow her to be towed to erie especially at this time of year. I don't believe that you understand the extent of deteriation of her keelsons, floors and stringers as well as her hull plates. All of this considered, who in their right mind would sign off on this vessel in herpresent condition.
Even ignoring that, there's simply no sense sense to state that they installed "temporary light plating". She was made watertight for the tow there in the first place. You don't replace a temporary repair with another temporary repair nor would penny pinching Lower Lakes pay to just have her sit idle in an expensive drydock for several weeks just to ultimately not do the repair work that she was there for.
-
Guest
Re: Cuyahoga and Michipicoten status
Permanent repairs were performed on the bottom plating. There wasn’t any temporary light plating.Guest wrote: November 20, 2024, 1:02 pm she will sit where she is until perment repairs are done. no agency is going to sign off on the temporary light plating done only so that she woul float in order to remove her from dry dock. I don't think that they would even allow her to be towed to erie especially at this time of year. I don't believe that you understand the extent of deteriation of her keelsons, floors and stringers as well as her hull plates. All of this considered, who in their right mind would sign off on this vessel in herpresent condition.
-
Guest
Re: Cuyahoga and Michipicoten status
Thank you.Duluth Guest wrote: November 20, 2024, 10:27 amShe was temporarily repaired at Thunder Bay and made the trip to Duluth under her own power with a tug escort all the way. She was drydocked in Superior, at Fraser Shipyards, where permanent repairs were made to the crack and associated framing. A slew of other non-compliance issues were also addressed at that time but she was operating on an extension to her 5 year (as well as a few other required surveys) when the stress crack opened up. There are other surveys coming due in Spring of 2025. As I understand it, even with the drydocking in Superior, Transport Canada wouldn't allow a continuance of the 1 year extension without a full drydocking survey (as well as the other overdue surveys) and satisfactory completion of the findings from them. She will likely be heading to Erie for those outstanding surveys and any work that arrises from the findings. Her fate will likely be decided after those surveys are completed and a price tag attached to the work. My $0.02.algowest wrote: November 20, 2024, 8:57 am If my memory is right on this one, Michipicoten had temporary repair done so she could make trip to Fraser/Duluth for inspection.
So permanent repairs have not been done.
Assume Fraser has winter layup work already booked, so that would be reason for Michipicoten to head to Erie for drydock and potential permanent repairs.
-
Guest
Re: Cuyahoga and Michipicoten status
she will sit where she is until perment repairs are done. no agency is going to sign off on the temporary light plating done only so that she woul float in order to remove her from dry dock. I don't think that they would even allow her to be towed to erie especially at this time of year. I don't believe that you understand the extent of deteriation of her keelsons, floors and stringers as well as her hull plates. All of this considered, who in their right mind would sign off on this vessel in herpresent condition.
-
Duluth Guest
Re: Cuyahoga and Michipicoten status
She was temporarily repaired at Thunder Bay and made the trip to Duluth under her own power with a tug escort all the way. She was drydocked in Superior, at Fraser Shipyards, where permanent repairs were made to the crack and associated framing. A slew of other non-compliance issues were also addressed at that time but she was operating on an extension to her 5 year (as well as a few other required surveys) when the stress crack opened up. There are other surveys coming due in Spring of 2025. As I understand it, even with the drydocking in Superior, Transport Canada wouldn't allow a continuance of the 1 year extension without a full drydocking survey (as well as the other overdue surveys) and satisfactory completion of the findings from them. She will likely be heading to Erie for those outstanding surveys and any work that arrises from the findings. Her fate will likely be decided after those surveys are completed and a price tag attached to the work. My $0.02.algowest wrote: November 20, 2024, 8:57 am If my memory is right on this one, Michipicoten had temporary repair done so she could make trip to Fraser/Duluth for inspection.
So permanent repairs have not been done.
Assume Fraser has winter layup work already booked, so that would be reason for Michipicoten to head to Erie for drydock and potential permanent repairs.
Re: Cuyahoga and Michipicoten status
If my memory is right on this one, Michipicoten had temporary repair done so she could make trip to Fraser/Duluth for inspection.
So permanent repairs have not been done.
Assume Fraser has winter layup work already booked, so that would be reason for Michipicoten to head to Erie for drydock and potential permanent repairs.
So permanent repairs have not been done.
Assume Fraser has winter layup work already booked, so that would be reason for Michipicoten to head to Erie for drydock and potential permanent repairs.
-
Guest
Re: Cuyahoga and Michipicoten status
She came into Superior under her own power. Given that the crack has been repaired, it’s fully conceivable that she will leave under her own power if she’s headed to Erie for her five-year inspection.
-
Guest
Re: Cuyahoga and Michipicoten status
Under her own power? Doubt that.a tow across superior in nov.?🤔 seems like scuttlebutt to me🤷
-
Guest
Re: Cuyahoga and Michipicoten status
Cuyahoga is rumored to be going to the scrap heap.Denny wrote: November 16, 2024, 6:23 pm With all the talk recently on the Michipicoten and the future for them as far as IF they will be out sailing again or not, all has been very quiet lately on the Cuyahoga from their fire this past Spring during Fit-Out at Ashtabula then. Anyone have any further news, reports along with updates and status on the Cuyahoga and Michipicoten?
-
Mn bob
Re: Cuyahoga and Michipicoten status
Why are they sending the michipicoton to Erie to have work done over the winter when it’s already sitting at a shipyard that can do whatever work needs to be done