Bethlehem Steel built the Cort for service between Taconite Harbor and Burns Harbor, but later settled into a Superior to BH routine. I wasn't aware that she loaded at TH in 2001. Do you have the dates(s)?silver bay wrote:the cort loaded at taconite harbor about 20 miles north of here in april 2001 before they shutdown
Stewart Cort in Silver Bay
Re: Stewart Cort in Silver Bay
-
silver bay
Re: Stewart Cort in Silver Bay
the cort loaded at taconite harbor about 20 miles north of here in april 2001 before they shutdown
-
Guest
Stewart Cort in Silver Bay
When was the last time they loaded anywhere besides Superior, Wisconsin ? TIA