Re: Calumet Grounding and a new Poe Lock
Posted: August 14, 2017, 7:25 am
Calumet entering upper Detroit River @ 0824 from Lake St Clair.
aka "Information Search"
https://search.boatnerd.com/
I won't speak for the original poster, but I took that comment to mean that because of the Jones Act, the US fleets continue to use the 1000 footers and other Poe Lock only ships well past their prime, repowering and modernizing them instead of outright replacement, like the Canadian fleets are doing. If new ships were built, they could be downsized to Seaway Max dimensions, therefore providing redundancy at the Soo. And allowing a smaller lock to be built if and when construction ever happens.Guest wrote:It isn't. To claim it is is completely dishonest.scott wrote:i didn't know The Jones Act was in charge of construction costs!
It isn't. To claim it is is completely dishonest.scott wrote:i didn't know The Jones Act was in charge of construction costs!
I have Hauled in Dyed Diesel to The Empire Mine a couple Dozen times!, The Tilden Mine is connected to the Empire Mine!,is also owned buy Cliffs!,and shares the entry driveway and the same scale and guard shack!,I am no expert!,but it sure seems easy to redirect the Rail road tracks to run to the Escanaba Docks!,as well as the Marquette Docks!,The Tilden Mine is double the size of the Empire!,and the reason the Empire Mine shut down was NOT because of the economy! it was because there is to much overburden to move to get to the good Material! This info was told to Me from the workers who work in the Mines! thank You, mn brettWoodtick wrote:The idea of the need for a new lock is questionable, the 13 boats that use it are at east 30 years old, their has been no investment in new American ships other than the labor saving tug barge combo. If we were truly worried about the national economy why was the Escanaba ore dock closed ? This was the only ore dock not dependent on the locks to ship ore out.
The Jones Act is going no where, it has solid bipartisan support. If it did just about every US merchant Mariner, including myself, could kiss goodbye to their jobs.Oscar wrote:The Jones Act has inflated the cost of this lock by 40% to 50%..Another reason the Jones Act needs to go.
Guest wrote:Why so much discussion on building a new Poe lock? If any one of the Seaway 15 locks were to suffer a problem, other than the flights, it would shut the system down. At the Soo there is already a back up lock, smaller but still good for sending cargo through on smaller ships. The mighty Poe, completed in 1968, is the youngest of them all.
Yes. Three flight locks at the end of the Welland Canal. But they are designed to keep traffic moving.Do any of the 15 locks on the St. Lawrence Seaway have a twin "just in case"?
A position the ship companies helped put themselves in. When the current Poe Lock was on the drawing boards, the companies lobbied The Corp of Engineers to expand the dimensions so they could build their super carriers. Vessels like the Oberstar that were lengthened could've remained within length to use the MacArthur Lock.Marc wrote: Its actually well over 13 vessels that are restricted to the Poe Lock. Oberstar & St. Clair for instance.
When you use misinformation to make your argument, it casts a cloud over your argument. Its actually well over 13 vessels that are restricted to the Poe Lock. Oberstar & St. Clair for instance. In fact, 70% of U.S.-flag carrying capacity can only use the Poe.Woodtick wrote:The idea of the need for a new lock is questionable, the 13 boats that use it are at east 30 years old, their has been no investment in new American ships other than the labor saving tug barge combo. If we were truly worried about the national economy why was the Escanaba ore dock closed ? This was the only ore dock not dependent on the locks to ship ore out.