lilkronk92 wrote:Read a recent article from the Rand Logistics webpage, I think the repowering of the Michipicoten has been moved to next spring. As for the Gott, not entirely sure
Latest press release on the Rand website (from mid-Nov.) states that the repowering is scheduled to take place over the winter with a target date for completion in April 2011.
Read a recent article from the Rand Logistics webpage, I think the repowering of the Michipicoten has been moved to next spring. As for the Gott, not entirely sure
When are these two supposed to lay-up to have their engines
replaced? Michipicoten was supposed to be taken out of service
sometime in December but, how much longer will the Gott run?