Gott & Michipicoten

Discussion board focusing on Great Lakes Shipping Question & Answer. From beginner to expert all posts are welcome.
hausen
Posts: 803
Joined: July 2, 2010, 1:36 pm

Re: Gott & Michipicoten

Unread post by hausen »

lilkronk92 wrote:Read a recent article from the Rand Logistics webpage, I think the repowering of the Michipicoten has been moved to next spring. As for the Gott, not entirely sure

Latest press release on the Rand website (from mid-Nov.) states that the repowering is scheduled to take place over the winter with a target date for completion in April 2011.
Guest

Re: Gott & Michipicoten

Unread post by Guest »

The Gott arrived at Bayship 11/22 and went right into the graving dock.
Guest

Re: Gott & Michipicoten

Unread post by Guest »

The Gott is drydocked now in Sturgeon Bay for her engine replacement.
lilkronk92

Re: Gott & Michipicoten

Unread post by lilkronk92 »

Read a recent article from the Rand Logistics webpage, I think the repowering of the Michipicoten has been moved to next spring. As for the Gott, not entirely sure
Raymond

Gott & Michipicoten

Unread post by Raymond »

When are these two supposed to lay-up to have their engines
replaced? Michipicoten was supposed to be taken out of service
sometime in December but, how much longer will the Gott run?
Post Reply