Re: Algoeast
Posted: January 1, 2015, 1:53 pm
I was stationed at MHI in Japan while the Texaco Brave was being constructed in 1976, and sailed on her as Master. Here are the facts as I remember them.
Texaco was initially looking at buying a Canadian tanker being built (Leon Simard) but at approximately $14-15 million, other options were considered. Orders was placed with MHI in 1975 and the ship was completed and purchased for $9.2 million. Texaco paid the Custom duty hence was able to purchase without waivers.
I disagree that the MHI installed equipment was inferior. By 1987, consideration must be given that the ship had already been in salt water trade for past ten years. Her cargo system was a Norwegian
Framo high pressure and we did have problems with the control valves on deck. However the pumps were designed to be lifted out to carry out repairs. The ship was built to work in ice and we ran all winter from Montreal and Halifax refinery to ports in Quebec and Newfoundland.
I left in 1986 while Texaco still owned the ship
and I was proud to have served on a fine ship.
Texaco was initially looking at buying a Canadian tanker being built (Leon Simard) but at approximately $14-15 million, other options were considered. Orders was placed with MHI in 1975 and the ship was completed and purchased for $9.2 million. Texaco paid the Custom duty hence was able to purchase without waivers.
I disagree that the MHI installed equipment was inferior. By 1987, consideration must be given that the ship had already been in salt water trade for past ten years. Her cargo system was a Norwegian
Framo high pressure and we did have problems with the control valves on deck. However the pumps were designed to be lifted out to carry out repairs. The ship was built to work in ice and we ran all winter from Montreal and Halifax refinery to ports in Quebec and Newfoundland.
I left in 1986 while Texaco still owned the ship
and I was proud to have served on a fine ship.